February 2010

January 2010

December 2009

November 2009

October 2009

Pouring the concrete foundations

Installing the Library mezzanine floor

September 2009

August 2009

The demolition continues...

July 2009

Piecing together the temporary restaurant

June 2009

The temporary drama studio goes in