Track Oxford High School's fantastic £9 million building programme here!
Watch our school hall, library, drama studios, refectory, lecture Theatre, admin centre, language Centre, emerge. Everything will be open by September 2010 except drama, which will open in December 2010.
The plans for our new facilities:
Watch our progress month by month:
February 2010
January 2010
December 2009
November 2009
October 2009
Pouring the concrete foundations
Installing the Library mezzanine floor
September 2009
August 2009
The demolition continues...
July 2009
Piecing together the temporary restaurant
June 2009
The temporary drama studio goes in
The temporary administration block in place
The way we were:
Main entrance
Kitchen entrance
Lecture theatre
Library